12/4/2023 0 Comments Best 3m gas mask filters![]() Move the slabs out of the way, making a plan on paper of what goes where so you can put them back in the same location.Ĭalculate the fall for your patio, using the final dimensions confirmed at the end of step 1. Measure the length and width of the paving area to confirm the final dimensions of your patio. Allow for your preferred joint size between each slab. Lay out the paving slabs in the desired pattern, either where you plan to build your patio or on a clear, flat area of lawn. This is also an opportunity to mix up paving from different pallets - important if you have natural stone slabs as it'll help to blend any varying shades. If possible, dry lay the patio to check that your measurements are correct. A patio is still level with a fall as the gradient is so gradual. The fall is a slight slope across a paved area that helps surface water to drain away easily. You'll also need to calculate and mark out the fall. The first step in creating your new patio is marking out the space. Wear safety goggles, gloves and a dust mask when mixing mortar to avoid cement coming into contact with your skin or eyes, or being inhaled.When operating a plate compactor wear steel toe-capped boots, safety goggles and ear protection.Cement, either wet or dry, can cause skin irritation, so always ensure you wash with soap and water if it comes into contact with your skin.If you find buried pipes or cables, you can employ a professional to relocate these, or consider an alternative location for your patio. Pipes and cables should be buried a minimum of 450mm below the surface, but you can't always be certain that this is the case - especially with older properties. Before you start excavating the sub-base area, use a hired cable avoidance tool (CAT) to check for any underground pipes or cables for gas, water, electricity, telephone or drainage services.We recommend always working with a friend or family member to reduce the strain of lifting. If you are laying slabs 600 x 600mm or larger, you must have someone to help you lift and lay them. Ear defenders - when using the plate compactor and angle grinder.Steel toe-capped work boots - when using the plate compactor.Rigger gloves - for handling paving slabs. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |